Side by side
Why both exist
They answer different questions.- The Planner answers “can we do this?” – before the week starts.
- Tracked time answers “what did it actually cost?” – after it happened.
Homepage wireframes and logging 34 is exactly the signal a project manager needs, and
neither number alone shows it.
Where they meet
The capacity strip
The Planner’s capacity strip shows both figures in one line:Capacity – PlannedPlanned is the sum of the blocks. Logged is the sum of the real time entries in the same window. Comparing them is the fastest read of whether the plan is being followed. See /planner/capacity-and-workload.28hof40h– Logged12h– Healthy
Blocks and time entries can be linked
Time can be logged against a block, so the block knows what really happened inside it. That link is why:- Deleting a block keeps any time logged inside it. The entries stay on the timesheet; they just stop pointing at a block.
- A block whose participants have logged time cannot be handed to someone else.
- A participant who has logged time inside a block cannot leave it until that time is moved or removed.
The same schedule sits behind both
Capacity in the Planner comes from the person’s work schedule. Expected hours on a timesheet come from that same schedule. SoPlanned 40h of 40h in the Planner
and Expected 40h on the timesheet are the same 40 hours. See
/timesheets/expected-vs-tracked-hours.
A full example
Sarah Lin, week of 21 July, Bluebird Coffee – Website Redesign.1
Monday: Priya plans the week
She creates blocks totalling 20h on
Homepage wireframes. The strip reads
Planned 20h of 40h – Light. Nothing has been logged.2
Sarah works, and tracks it
Sarah runs the timer as she works. By Friday she has logged 24h on the
task – four more than planned.
3
The strip tells the story
Planned 20h of 40h – Logged 24h. The plan was optimistic.
4
Only the tracked time has money attached
24 hours at Sarah’s 2,400** of value to the
project. At her 1,080**, leaving
$1,320 of margin. The 20 planned hours are worth nothing – they were never
worked.
5
The budget moves, once
The 2,400, from the tracked time only. The
plan never touched it.
6
The timesheet is what gets approved
Sarah submits the week. Priya approves 24 hours. The blocks are not part of
that – they were never a submission.
What this means for reporting
Reports are built on time entries, not on blocks. See
/reports/report-sources.
Common questions
Can I turn a block into a time entry?
Can I turn a block into a time entry?
Not automatically. Blocks and time entries are separate on purpose – a plan
that logs itself would put hours on a timesheet nobody worked, and a
timesheet is a system of record.
Does the billable switch on a block bill anything?
Does the billable switch on a block bill anything?
No. It records the intent. Billability is decided on the time entry. See
/time-tracking/billable-hours.
Do blocks consume a project budget?
Do blocks consume a project budget?
No. Only tracked time does.
If I delete a block, do I lose the time?
If I delete a block, do I lose the time?
No. The confirmation says so plainly: any time already logged inside it is
kept, it just stops being tied to a block.
Should I plan every hour of the week?
Should I plan every hour of the week?
No. Aim for around 80% – Healthy rather than Full. The rest of the week
fills itself with things nobody planned.
Can a client see planned blocks in the portal?
Can a client see planned blocks in the portal?
No. The client portal shows what was delivered and billed, not internal plans.
Troubleshooting
Related guides
Capacity and workload
Planned against logged, in one line.
How to track time
Turning a plan into a record.
Expected vs tracked hours
The other comparison, on the timesheet.
Budget vs estimate
Two more numbers people mix up.
Plan work blocks
Building the plan side.
Billable hours
What actually reaches an invoice.