Archiving takes the task off the board and out of task lists. Its time entries and history are preserved, so reports and invoices built on that work are untouched.Archive is the right choice for finished work you want out of the way but not out of the record.
The body states that nothing is destroyed yet, and where to find the task again.
3
Confirm
A toast confirms “Task moved to Trash.”
What travels with a deleted task:
Its subtasks, which are trashed at the same moment and stamped so a later restore reclaims exactly the ones this delete took.
Its comments, attachments and dependencies stay attached to the row and come back with it.
What changes immediately:
The task disappears from lists, boards and your day view.
The project’s task count drops.
Any task that depended on it stops showing it as a blocker.
Any timesheet or report built on already-recorded time is unaffected.
A deleted task returns null to every screen still watching it, so an open detail panel closes itself rather than leaving a husk of a task that is gone.
A confirmation appears, then a toast confirms “Task restored.”
Restoring gives back everything the delete took: the subtasks that went with it, and the project’s task count.The same Restore item appears in the task’s own Actions menu when the task is archived or trashed.Restore is deliberately never blocked by an app being switched off – recovery stays reachable whatever the workspace has turned on.
A permanent delete is refused while the financial or historical record still points at the task. The message names what is in the way – for example the number of time entries still attached.That refusal is on purpose. A system of record does not orphan a time entry to make a delete succeed.
A trashed task stays restorable for a limited period, then is cleaned up automatically. The default retention is 30 days. See /settings/trash for your workspace’s setting.
Select cards on the board and use Delete on the bulk bar. From 10 tasks upward the modal asks you to type the count before it lets you confirm. Each task and its subtasks move to Trash together. See /tasks/bulk-actions.
Priya Raman is tidying up Bluebird Coffee – Website Redesign after launch.She archives the 40 finished tasks. They leave the board, but the 260 hours tracked against them still appear on the project profitability report and on the invoice already sent.She then finds WR-118 Test task, created by mistake and never used. She opens it, chooses Delete, and it moves to Trash along with its one subtask.The next day she realises WR-118 had a comment worth keeping. She opens Trash, clicks Restore, and both the task and the subtask come back exactly as they were.
No. Time entries are separate records with their own lifecycle. Moving a task to Trash does not touch the hours already recorded against it, and a permanent delete is refused while entries still point at it.
Can I restore one subtask on its own?
Restoring the parent brings back the subtasks that went with that delete. A subtask deleted on its own can be restored on its own.
What happens to a task that blocked something else?
The dependent task stops showing it as a blocker while it is in Trash. The link survives, so restoring the blocker restores the relationship.
Is an archived task included in reports?
Yes. Archive hides work from day-to-day views but keeps it reportable. Trash removes it from views and reports until restored.
Who can see Trash?
Trash is a workspace surface at /settings/trash. What you can restore from it follows the same capability as deleting it.