/{workspaceSlug}/settings/time-policies. For Northwind Studio that is
/northwind/settings/time-policies.
This page documents the screen. For how the rules feel day to day when you are
tracking, read Time policies.
Who can change what
The Time policies item sits under Workspace in the settings sidebar. It is shown to everyone, and it belongs to no app, so it never disappears.
Without the capability, the card still renders but tells you so:
- Entry rules – You don’t have access to change time policies in this workspace. Ask an owner or admin for access.
- Timesheet submission – the dropdown is disabled, with the line Only owners and admins can change the timesheet period.
- Period locking – Only an owner or admin can lock periods in this workspace.
Card 1 – Entry rules
Three toggles, three number fields and one dropdown. Everything in this card is saved together by the Save time policies button at the bottom. The button reads Saving… while it works, and a Time policies saved. message confirms it. A brand-new workspace enforces nothing. Every toggle starts off, both limits start blank, rounding starts at none.Require a task
Why it exists. Time attached only to a project cannot be traced to the work it
paid for. Turning this on forces every hour to name a task.
When to turn it on. Once your projects have real task lists. Turning it on
before that leaves people with nothing to pick.
What happens after. Saving an entry with no task is refused with A task is
required before this entry can be saved. A running timer cannot be stopped until a
task is chosen either – the stop button tells you Add a task to stop the timer.
Require a description
Why it exists. A client asking “what were these 6 hours?” needs an answer. The
description is that answer, and it prints on an invoice line.
What happens after. An entry with an empty or whitespace-only description is
refused with A description is required before this entry can be saved. A running
timer cannot be stopped without one.
Block future entries
Why it exists. Time is a record of work done, not work planned. Plan ahead in
the Resource Planner instead.
What happens after. An entry that starts later than right now is refused with
Time entries cannot start in the future. Only the start time is checked.
Editing window (days)
Why it exists. It stops last month’s approved week quietly changing shape after
you reported on it.
How it is measured. From when the entry starts, to now. An entry exactly on the
boundary is still editable. With a 14-day window, an entry that started 14 days ago
can be changed, and one that started 15 days ago cannot.
What happens after. Editing an entry past the window is refused with This entry
is outside the editing window and can no longer be changed.
Daily limit (minutes)
Why it exists. It catches the honest mistake – a timer left running overnight
that turns into a 14-hour entry.
How it is measured. In minutes, across the whole day, per person. A new entry is
refused when the day’s existing total plus the new entry goes over the cap. A
day that lands exactly on the cap is allowed. Set
600 for 10 hours, 720 for 12.
What happens after. The entry is refused with This entry would exceed the daily
time limit for this workspace.
Idle threshold (minutes)
Why it exists. People walk away from a running timer. Idle detection notices,
so the entry reflects real work.
What happens after. Once the timer has seen no input for this many minutes, a
prompt appears offering to Keep or Discard the idle stretch. This field
cannot be left blank and cannot be
0.
Rounding increment
Why it exists. Many agencies bill in fixed blocks. Rounding produces the
billable figure without anyone doing the arithmetic.
How it rounds. Always to the nearest step. There is no round-up-only or
round-down-only option. A half step rounds up.
What it touches. The billable duration used on invoices and against project
budgets. Your exact tracked time is always kept alongside it, so you can always see
what really happened.
Card 2 – Timesheet submission
This sets how much time one submission bundles. The card explains it: Submitting
any week submits the whole period that contains it.
There is no Save button here. Choosing an option saves it at once, and a message
confirms the new setting.
The daily grid stays a seven-day week whatever you pick. Only the unit that is
submitted and approved together changes.
Card 3 – Period locking
Locking freezes a stretch of approved time so the books stop moving. The card explains it: Locks all approved time on or before a date. Locked entries can’t be edited, deleted or added to – corrections go through adjustment entries.How to close a period
1
Pick the date
Choose the last day to lock in Close through date. The date is read in your
workspace timezone, so the day boundary matches the one your team sees.
2
Start the close
Click Close period…. A confirmation modal opens, titled Close the period
through your chosen date.
3
Confirm it in writing
The modal asks you to type the workspace and date to confirm – for Northwind
Studio closing through 31 July that is
northwind / through 2026-07-31. A copy
button beside the text puts it on your clipboard.4
Close it
Click Close period. When it finishes you see how many entries were locked –
for example Period closed through 2026-07-31. 412 entries locked.
What gets locked, and what does not
Example
Northwind Studio tightens up as it starts invoicing Bluebird Coffee monthly.1
Maya sets the entry rules
She turns on Require a task and Require a description, sets Editing
window (days) to
14, and leaves the daily limit blank. She clicks Save
time policies.2
Sarah feels it the next morning
Sarah Lin starts a timer with no task. When she tries to stop it, the button
tells her to add a task. She picks “Homepage wireframes” and stops it.
3
Rounding sets the billable figure
With rounding at 15 minutes, Sarah’s 3 h 07 min becomes 3 h 00 of billable time.
At her 300 to the Website Redesign budget. Her
exact 3 h 07 min is still on the entry.
4
Daniel closes the month
Once Priya Raman has approved July and Daniel Okafor has invoiced it, Maya
closes the period through 31 July. July stops moving.
Loading state
While the workspace loads, each card shows placeholder bars in place of its controls. Nothing is saved until you press the button on the card you changed.Errors you may see
Common questions
Do these rules apply to admins too?
Do these rules apply to admins too?
Yes. There is one set of rules for the workspace, and it binds everyone.
Can I set different rules per project or per person?
Can I set different rules per project or per person?
No. Time policies are workspace-wide.
Does turning on Require a task fix old entries?
Does turning on Require a task fix old entries?
No. The rules are checked when an entry is saved. Entries already recorded stay
exactly as they are.
Does rounding change my tracked time?
Does rounding change my tracked time?
No. The exact duration is always kept. Rounding produces the billable figure
that invoices and budgets use.
Can I reopen a closed period?
Can I reopen a closed period?
Not from this screen. Correct locked time with an adjustment entry instead.
Why was my old entry refused when I tried to fix a typo?
Why was my old entry refused when I tried to fix a typo?
The editing window has passed. Ask an Owner or Admin to widen the window, or
leave it blank to remove the limit.
Related guides
Time policies in practice
What each rule feels like while you are tracking.
Time tracking overview
How time gets recorded, submitted and approved.
Edit a time entry
What you can change, and when the window closes.
Using the timer
Starting, stopping and idle detection.
Timesheets overview
How a submission period is filled in and approved.
Time entry fields
Every field on an entry, including task and description.